Placeholder
Skip to content
🚚 FREE SHIPPING on orders over $100 (USA & Canada only).
🚚 FREE SHIPPING on orders over $100 (USA & Canada only).

Subaru Phase 2 EJ SOHC Head Stud Installation Guide (1999+) — CP886

This guide covers installation of the XOTIC PERFORMANCE™ CP886 head stud kit for 1999+ Subaru Phase 2 EJ series SOHC engines. Running the DOHC turbo EJ20/EJ25 from a WRX or STI instead? That's the CP882 kit and guide. Prefer a printable copy? Download the PDF manual.

Why the Phase 2 EJ needs head studs

Factory OEM head bolts are torque-to-yield: you torque them to a specified value, then add a final 90° rotation that stretches the bolt to its maximum point. That works at stock power levels. But when you add parts that increase horsepower — forced induction, a tune, supporting mods — you create higher cylinder pressures lower in your RPM range, and the clamping force securing the gasket, head, and block is no longer sufficient. The result: a blown head gasket, the EJ's best-known weakness.

Head studs are engineered to resist stretching. XOTIC PERFORMANCE™ head studs are manufactured from our premium XOTIC 7200 steel alloy, superior in tensile strength to any bolt, and backed by a lifetime warranty. The key to getting that strength into your engine is accurate preload — the tensile force generated when a fastener is tightened, creating clamp force in the joint. Everything in this guide is in service of achieving equal, accurate preload on all 12 studs.

What's in the CP886 kit

  • 12 × head studs (XOTIC 7200 alloy)
  • 12 × hardened parallel washers
  • 12 × nuts
  • 1 × socket
  • 1 × allen wrench
  • 1 × fastener assembly lubricant

Before you start: verify first

Confirm that part number CP886 is compatible with your application (1999+ Subaru Phase 2 EJ series SOHC) before installing any components. Inspect all package contents and clean as necessary to ensure accurate installation. Report any obvious defects or shipping damage to us before proceeding.

How to install head studs on a Phase 2 EJ SOHC

  1. Clean the block threads. Clean the threads in the block prior to installing the head studs to ensure accurate fitment and precise torque readings. A dedicated M11 x 1.25 thread chaser (CS305) makes this fast and protects the threads.
  2. Install the studs hand-tight. Thread the head studs into the block by hand until snug. Do not apply torque.
  3. Check stud height with a straightedge. Use a straightedge ruler to measure the distance from the mating surface (deck or main cap) to the top of each installed stud. Ensure all studs of the same length group sit level with each other (within 1 mm / 0.040”). Uneven height may indicate debris or incorrect thread engagement. Properly installed studs will bottom out smoothly and show uniform height across all positions. If a stud appears higher or lower than the others, remove it, re-clean the hole, and reinstall by hand. Do not use tools to force studs deeper. Incorrect stud seating can cause off-angle stress, uneven preload, or stud fracture during engine operation.
  4. Set the gasket and head. Install the head gasket and cylinder head, ensuring proper alignment.
  5. Clean the washer seating areas. Clean the washer seating surfaces on the cylinder head with a fast-evaporating solvent such as non-chlorinated brake cleaner to remove oil, grease, and contaminants. A clean surface is essential for achieving proper fastener preload.
  6. Lubricate. Place the washers onto the studs. Using the supplied assembly lubricant, apply a thin coat to the stud threads, the underside of the nuts, and the top side of the washers.
  7. Install the nuts. Thread the nuts onto the studs and hand-tighten until they make contact with the washers.
  8. Torque in sequence. Follow the torque stages below in the numbered sequence shown in the manual's torque sequence diagram.

Subaru Phase 2 EJ head stud torque specs

Stage Torque
1 30 ft-lbs
2 60 ft-lbs
3 (final) 90 ft-lbs

CP886 Subaru Phase 2 EJ SOHC head stud torque sequence installation diagram

A common mistake to avoid: when torquing a fastener, do not stop short of the recommended value — continue in one motion until the specified torque is achieved. If you accidentally stop short, loosen the fastener and re-torque. Stopping short and "topping up" produces unequal preload distribution across the studs and risks joint failure.

Frequently asked questions

What are the torque specs for Phase 2 EJ head studs?

Three stages, following the numbered sequence: 30 ft-lbs, then 60 ft-lbs, then a final pass at 90 ft-lbs.

Which engines does the CP886 kit fit?

1999+ Subaru Phase 2 EJ series SOHC engines.

What about the DOHC turbo EJ20/EJ25 in my WRX or STI?

Those use the CP882 kit — see our WRX/STI head stud installation guide.

What size thread chaser do I need?

M11 x 1.25 — the CS305 chaser.

Need help?

For technical support, email support@xotic-performance.com. All XOTIC PERFORMANCE™ fasteners are covered by our limited lifetime warranty. Finished your install? Tag #XOTICPERFORMANCE on Instagram for a chance to be featured.


© 2026 XOTIC PERFORMANCE™. This installation guide is an original copyrighted work of XOTIC PERFORMANCE™. Reproduction, distribution, or use of this content in whole or in part without written permission is prohibited. Doc ref: 2025.05.27 (web edition 2026.08).

Previous article 6.2L & 6.5L Chevrolet/GM Diesel Head Stud Installation Guide (1982–2000) — M4334

Leave a comment

Comments must be approved before appearing

* Required fields